Next, the last valve, the number four exhaust valve is ground to the correct height and installed. The two valves now act as a guild for setting the height on the rest of the valves in the cylinder head.

CH09.jpg (68486 bytes)Our FE block uses a fixed rocker bar that hold the individual rocker arms.  Since this a hydraulic  lifter application, setting the height correctly is critical, as no further adjustment is available.  

A straight edge is used between the first and last valve to check each valve as it is ground and temporally installed.

With all the sticks ground and test fit, the heads are ready to be assembled.

Mike shoots some assembly lube on the stems prior to installing them in the head.  After the valve is installed, an umbrella style oil seal is used to control oil.  

The seals are installed over the stem before the valve springs are installed.  Each valve is them tested for opening and closing operation.

With all the valves installed and the fit re-checked the job is done and ready for reinstallation on the cylinder block. [more]

 