 The frame to the left is missing the pivot points. New points are
sitting on the face of the hinge frame, ready to install. The frame to the right
shows the pivots in place between the hinge and frame. The pin pasts through all of
these parts to hold the assemble together. |
 Above
shows the left hinge with the new pivot points. The assembly is together and
ready to have the pin set. The right hinge assembly shows someone of the repairs
needed. A stress fracture and missing tab need welding up. (Right) You can see the how the bushings act as the new pivot
surface. |